Exwick Heights

About

This school project was carried out for Allwood who are timber frame manufacturers. In common with much of our timber frame work design was progressed to a tight program and EandM West provided both engineering and fabrication detailing for the project.

Key features include long span engineered roof joists combined with Glulam beams. Joist sections were overlapped, plated and cut to accommodate clerestorey window detaling

Credits

Instructing client: Allwood